EICRs & landlord certificates
EICRs & landlord electrical safety certificates
An Electrical Installation Condition Report is a full inspection and test of the fixed wiring in a property, ending in a document that says whether it is satisfactory or not. If you let property in England, it is not optional.
The legal position for landlords
Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, a landlord must:
- Have the installation inspected and tested at least every 5 years;
- Give the tenant a copy of the report within 28 days;
- Give a copy to a new tenant before they move in;
- Supply it to the local authority within 7 days if asked;
- Carry out any C1, C2 or FI remedial work within 28 days (or sooner if the report says so) and get written confirmation it is done.
Councils can fine up to £30,000 for non-compliance. Homeowners are advised, though not required, to have an EICR every 10 years.
What the codes mean
- C1 — danger present. Immediate risk. I make it safe on the spot before leaving.
- C2 — potentially dangerous. Needs fixing promptly. C1 or C2 anywhere means the report is unsatisfactory.
- FI — further investigation required. Also makes a report unsatisfactory.
- C3 — improvement recommended. Does not make a report unsatisfactory, and does not have to be actioned. Be wary of anyone pressuring you to pay for C3 work as though it were compulsory.
One contractor, not two
The common frustration with EICRs is getting a fail from an inspector who does not do repairs, then chasing a second electrician who has to re-inspect before quoting. I do the inspection and the remedial work, and issue the paperwork at the end — one visit, one invoice, one point of contact, and no incentive for me to inflate the findings because you are free to take the report elsewhere.
Portfolios
If you have several properties, send me the addresses and I will tell you which are due and when. Landlords and letting agents with more than a couple of units get scheduled together, which keeps the cost per property down.
Common questions
How long does an EICR take?
A typical two or three-bedroom house is two to four hours. The power goes off for parts of it because a proper report involves dead testing, not just a visual check — anyone in and out in twenty minutes has not done the test.
What happens if it fails?
You get the report with each item coded, and a separate quote for the remedial work. Nothing is done without your say-so. If there is a C1 I make that item safe before I leave, because leaving known danger is not an option.
How often does a rented property need one?
Every 5 years minimum in England, and a copy has to reach the tenant within 28 days. New tenants need it before they move in.
Do I need an EICR to sell my house?
No, it is not required to sell. Buyers' solicitors normally ask for certificates for any notifiable work done, which is a different thing. An EICR can still be worth having if the buyer's survey flags the electrics.
Other things I do
Fuse boards & consumer units
Old fuse box swapped for a modern consumer unit with RCBO protection on every circuit, tested and certified in a day.
House rewires
Full and partial rewires, planned around you room by room so you are never left without power or lighting overnight.
EV charger installation
Home EV charge points installed and certified, with an honest answer on whether your supply needs load management.
Want a price?
Tell me a bit about the job and I'll come and look. No charge for the visit, and a fixed price before anything starts.